National Program for Inspection of Non-Federal Dams. Monsanto Company Upper Dam (MA 00573), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report.

Abstract

This earthfill embankment dam is about 145 ft. long with a maximum height of about 12 ft. The project is considered to be in fair condition. The dam is small in size having a hazard potential of significant. The owner should employ a qualified engineer to conduct further studies to determine the measures that are necessary to improve discharge capacities. (Author).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1978
Accession Number
ADA155453

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Concrete
  • Connecticut
  • Connecticut River
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Inspection
  • Massachusetts
  • New England
  • Photographs
  • Safety
  • United States
  • Visual Inspection

Readers

  • Hydraulic Engineering.