National Program for Inspection of Non-Federal Dams. New Pond Dam (MA 00779), Massachusetts Coastal Basin, Easton, Massachusetts. Phase I Inspection Report.

Abstract

The dam is about 1100 ft. long with a maximum height of about 14 ft. It is considered to be in fair condition. It is small in size with a significant hazard potential. Technical inspections should be performed every year by a qualified, registered engineer. (Author).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1981
Accession Number
ADA155495

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Civil Engineering
  • Concrete
  • Construction
  • Dams
  • Embankments
  • Engineering
  • Engineers
  • Failure Analysis
  • Flood Control
  • Floods
  • Geotechnical Engineering
  • Massachusetts
  • Materials
  • New England
  • Structural Engineering
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.