National Program for Inspection of Non-Federal Dams. Cedar Pond Dam (MA 00684), Thames River Basin, Sturbridge, Massachusetts. Phase I Inspection Report.

Abstract

The dam is a 340 ft. long, 9 ft. high earthfill dam. The dam is in fair condition. There are deficiencies which must be corrected. It has been classified as small in size with a significant hazard potential. (Author).

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1979
Accession Number
ADA155532

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Continents
  • Deficiencies
  • Drainage Basins
  • Geographic Basins
  • Geographic Regions
  • Inspection
  • Landforms
  • Massachusetts

Readers

  • Hydraulic Engineering.