National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report.

Abstract

Chaffin Pond Dam is actually a section of roadway embankment approximately 135 ft. long, 11 ft. high and with a minimum width of 100 ft. Three submerged culvert outlets pass through the dam between upstream and downstream headwalls, allowing the water level to be the same on both sides of the dam. The control entrance to the assumed 30-in. diameter outlet on the left side has slots for stoplogs; however, none are in place. The control for a 4-ft. box culvert in the center is an open wood gate. The third outlet culvert is also gated but apparently blocked. Water from Chaffin Pond flows to outlet works at a second pond downstream from the dam where water is drawn for hydraulic research purposes. The dam is in poor condition, based on a visual examination of the structure. The headwalls have experienced major structural failures and the potential for a collapse of the upstream headwall with possible obstruction of flow to the outlet does exist. Hydraulic analyses indicate that the test flood would surcharge the pond by 680 acre-ft. and raise the pond level to about 4.2 ft. below the top of the dam. Therefore, no overtopping would be expected.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1979
Accession Number
ADA155557

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Classification
  • Collapse
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Failure Analysis
  • Flood Control
  • Massachusetts
  • Materials
  • Materials Testing
  • New England
  • Test And Evaluation
  • United States
  • Visual Inspection

Readers

  • Hydraulic Engineering.