National Program for Inspection of Non-Federal Dams, Lovell Reservoir Dam (MA 00872) and Dike (MA 01334), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report.
Abstract
The project is comprised of and 800 foot long, 80 foot hydraulic height, earthfill main dam, and a 18 foot hydraulic height, 1,600 foot long earthfill dike. The main dam has a 78.5 foot long concrete spillway with a 450 foot long concrete and stone outlet channel. The spillway has a capacity of 4,320 cfs (to top of dam elevation 770.5) which is approximately 73 percent of the test flood outflow. The dam and dike are generally in fair condition.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1980
- Accession Number
- ADA155616
Entities
Organizations
- New England District, U.S. Army Corps of Engineers