National Program for Inspection of Non-Federal Dams. Muddy cove Pond Dam (MA 00793) Taunton River Basin, Dighton, Massachusetts. Phase I Inspection Report.

Abstract

Muddy Cove Pond Dam is approximately 985 feet long including the spillway and has a maximum height of approximately 32 feet. It consists of an embankment with riprap wave protection on the upstream face and a loamed and seeded crest and downstream face. The spillway is located approximately two thirds of the distance across the dam from the left abutment. The facility is considered in good condition. There are no obvious signs of impending failure or conditions which would warrant urgent remedial measures. The estimated test flood stage is about 2.7 feet below the spillway abutments. An investigation is recommended to evaluate the observed seepage at the toe of the dam embankment. Recommended remedial measures include the removal of brush from riprap and along spillway walls, restoration of eroded areas along spillway walls and gatehouse, filling of animal burrows, the monitoring of riprap erosion and seepage at embankment toe, and maintenance of the gatehouse door and reservoir sluice gate.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1979
Accession Number
ADA155634

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Classification
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Massachusetts
  • New England
  • Riprap
  • Safety
  • Spillways
  • Test And Evaluation
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.