National Program for Inspection of Non-Federal Dams. Roberts Meadow Reservoir. Middle Dam (MA 00761), Connecticut River Basin, Northampton, Massachusetts. Phase I Inspection Report.
Abstract
This dam is a 403 foot long, 42 foot high stone masonry structure. The visual inspection did not disclose any findings that indicated an immediate unsafe condition. The city is in the midst of a program of pressure grouting this dam to stop leaking which was extensive. At the time of the inspection, water was still leaking through the dam but at a much lesser rate than previously reported. The dam's spillway will not pass either the PMF or 1/2 PMF without overtopping the dam, and the spillway is not considered adequate. There is an area of standing water existing below the right abutment of the dam. This area should be cleaned and a surface drainage system installed.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1978
- Accession Number
- ADA155652
Entities
Organizations
- New England District, U.S. Army Corps of Engineers