National Program for Inspection of Non-Federal Dams. Sargent Pond Dam MA 00986, Thames River Basin, Leicester, Massachusetts. Phase I Inspection Report.

Abstract

The dam is about 214 ft. long. It basically consists of a rubble masonry and concrete gravity spillway and two earth embankments. The dam is judged to be in fair condition. There is no seepage evident along the earth embankments. The size is small with a hazard potential of significant. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1980
Accession Number
ADA155784

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Masonry
  • Massachusetts
  • Materials
  • New England
  • Plastic Explosives
  • Retaining Walls
  • Spillways
  • United States
  • Visual Inspection

Readers

  • Hydraulic Engineering.