National Program for Inspection of Non-Federal Dams. Manchaug Pond Dam MA 00955, Blackstone River Basin, Sutton, Massachusetts. Phase I Inspection Report.

Abstract

The dam is a composite rubble masonry and earthfill structure about 330 ft. long and 28 ft. high. The dam is judged to be in generally good physical condition. However, because of the inadequate spillway discharge capacity, it is rated in fair condition. The rubble masonry upstream face need minor repointing and the right wall of the approach channel to the spillway should be repointed. It is intermediate in size with a hazard potential of high. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1980
Accession Number
ADA155785

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Classification
  • Composite Materials
  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Judgment
  • Maintenance
  • Massachusetts
  • New England
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.