National Program for Inspection of Non-Federal Dams. Waban Hill Reservoir Dam MA 01111, Charles River Basin, Newton, Massachusetts. Phase I Inspection Report.

Abstract

The embankment surrounds the reservoir for a distance of about 1100 ft. The dam is small in size with a hazard potential of high. The dam is judged to be in fair condition at the present time owing to the apparently inoperative lower sluice gate, riprap failures in the interior face and excessive vegetation on the interior and exterior faces. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1980
Accession Number
ADA155790

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Classification
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Field Conditions
  • Flood Control
  • Flood Damage
  • Maintenance
  • Massachusetts
  • New England
  • Riprap
  • Spillways
  • United States
  • Visual Inspection

Readers

  • Hydraulic Engineering.