Review of Reports, Charleston Harbor, South Carolina. Appendices. Wando River Extension. Revision.
Abstract
The most desirable plan from an economic safety and environmental standpoint would provide for a channel 40 feet deep and 450 feet wide from the existing Charleston Harbor project to a turning basin with a turning diameter of 1200 feet. Appendixes: A: Study Authorizations, Prior Reports and Public Meetings; B: Problem Identification; C: Economic Analysis; D: Engineering Investigation Design and Cost Estimates; E: Environmental Analysis; F: Formulation, Assessment and Evaluation of Detailed Plan; G: Comments from Other Agencies.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1984
- Accession Number
- ADA155885