National Program for Inspection of Non-Federal Dams. Upper Groveton Dam N.H. 00148, Connecticut River Basin, Groveton, New Hampshire. Phase I Inspection Report.

Abstract

The dam is a run of the river, timber crib stone fill dam with concrete abutment and flood gates. It is 120 ft. long and 21 ft. high. It is small in size with a low hazard classification. The dam was found to be in good overall condition based on the limited visual inspection. There are some indications of a flow of water downstream and beneath the right abutment. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1979
Accession Number
ADA155998

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Concrete
  • Connecticut River
  • Construction
  • Dams
  • Drainage Basins
  • Engineering
  • Engineers
  • Flood Control
  • Flow
  • Maintenance
  • Materials
  • New England
  • New Hampshire
  • Plastic Explosives
  • Power
  • Visual Inspection
  • Water Resources

Readers

  • Hydraulic Engineering.