National Program for Inspection of Non-Federal Dams. Windsor Upper Dam (VT 00013), Connecticut River Basin, Windsor, Connecticut. Phase I Inspection Report.
Abstract
The dam is considered to be in fair condition. The dam is believed to be safe under normal operating conditions. The test flood is the PMF. It is recommended that the owner engage the services of a qualified consultant to evaluate the stability of the dam. In addition to long term recommendations, there are several remedial measures which should be implemented. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1978
- Accession Number
- ADA156017
Entities
Organizations
- New England District, U.S. Army Corps of Engineers