National Program for Inspection of Non-Federal Dams. Ice Pond Dam (NH00145), Connecticut River Basin, Littleton, New Hampshire. Phase I Inspection Report.

Abstract

The dam is a masonry earth fill dam with cut stone spillway, 125 ft. long and 20 ft. high. It is small in size with a significant hazard classification. The dam was judged to be in fair condition. The downstream spillway training walls are partially collapsed. The owner should implement a systematic maintenance program consisting of various items. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1979
Accession Number
ADA156143

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Construction
  • Dams
  • Drainage Basins
  • Earth Fills
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Flood Plains
  • Gates
  • Materials
  • New England
  • New Hampshire
  • Safety
  • Visual Inspection
  • Warning Systems
  • Water Resources

Readers

  • Hydraulic Engineering.