National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00575), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report.

Abstract

The dam is about 48 ft. long and 13 ft. high. It is constructed of cut stone masonry. The dam is generally in poor condition. The right end of the dam has had a partial failure at the crest. The dam is classified as small in size with a hazard potential of low. Recommendations for remedial work include repair of the failed area at the right end of the crest of the dam, the plugging of pressure leaks in the dam and mortaring of open joints, and the repair of erosion damage at the right abutment. (Author).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1978
Accession Number
ADA156231

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Connecticut
  • Connecticut River
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Massachusetts
  • Materials
  • Materials Testing
  • New England
  • Safety
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.