National Program for Inspection of Non-Federal Dams. Campton Pond Dam (N.H. 00130) Merrimack River, Basin, Campton, New Hampshire. Phase I Inspetion Report.

Abstract

The dam is composed of three main sections including an earth dike with stone masonry retaining wall, a concrete dike section and a solid concrete spillway section. It is small in size with a significant hazard classification. The dam was found to be in fair condition based on a limited spillway capacity of only 52 percent of the test flood. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1979
Accession Number
ADA156287

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Advanced Electronics
  • Human Systems

DTIC Thesaurus Topics

  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Emergencies
  • Engineering
  • Engineers
  • Flood Control
  • Materials
  • New England
  • New Hampshire
  • Retaining Walls
  • Safety
  • United States
  • Visual Inspection
  • Warning Systems
  • Water Resources

Readers

  • Hydraulic Engineering.