National Program for Inspection of Non-Federal Dams, Merrymeeting Lake Dam (NH 00342), Merrimack River Basin, New Durham, New Hampshire. Phase I Inspection Report.

Abstract

The dam is an earth embankment structure. The dam is 286 ft. long and 22 ft. high. The condition of the dam is fair in spite of a continued history of seepage through the dam that has not been eliminated by refacing the upstream side of the dam. The estimated PMF would overtop the dam by 6.6 ft. (Author).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1978
Accession Number
ADA156448

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • C4I

DTIC Thesaurus Topics

  • Construction
  • Dams
  • Data Acquisition
  • Drainage Basins
  • Embankments
  • Emergencies
  • Engineering
  • Engineers
  • Flood Control
  • Gates
  • Materials
  • New England
  • New Hampshire
  • Plastic Explosives
  • Visual Inspection
  • Warning Systems
  • Water Resources

Readers

  • Hydrologic Risk Analysis and Mitigation.