National Program for Inspection of Non-Federal Dams, Upper Wilson Pond Dam (NH 00202), Connecticut River Basin, Swanzey, New Hampshire. Phase I Inspection Report.

Abstract

The dam is constructed of reinforced concrete and earth fill. It is about 225 ft. long and 16.6 ft. high. The dam is small in size with a high hazard potential. The dam is in poor condition at the present time. The spillway is capable of passing 5% of the Test Flood routed peak outflow. (Author).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1981
Accession Number
ADA156451

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Climate Change
  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Earth Fills
  • Embankments
  • Engineers
  • Failure Mode And Effect Analysis
  • Maintenance
  • New England
  • New Hampshire
  • Plastic Explosives
  • Safety
  • Visual Inspection
  • Warning Systems
  • Water Resources

Readers

  • Hydraulic Engineering.