National Program for Inspection of Non-Federal Dams. Milton Leather Board Dam (NH 00316), Piscataqua River Basin, Milton, New Hampshire. Phase I Inspection Report.
Abstract
The Milton Leather Board Dam is a mortar-laid stone masonry and concrete gravity dam founded on bedrock. The dam varies from about 2 ft. to about 32 ft. high, and is about 350 ft. long. Based on the visual inspection and reports of past operational performance, the dam is assessed to be in fair condition. Areas of major concern regarding the long-term safety of the dam include deterioration of the concrete dike section and the concrete stop log piers. It is small in size with a significant hazard potential. Keywords include: Inspection, Dam safety, Piscataqua River Basin, Milton, New Hampshire, and Salmon Falls River.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1979
- Accession Number
- ADA156475
Entities
Organizations
- New England District, U.S. Army Corps of Engineers