National Program for Inspection of Non-Federal Dams. Milton Leather Board Dam (NH 00316), Piscataqua River Basin, Milton, New Hampshire. Phase I Inspection Report.

Abstract

The Milton Leather Board Dam is a mortar-laid stone masonry and concrete gravity dam founded on bedrock. The dam varies from about 2 ft. to about 32 ft. high, and is about 350 ft. long. Based on the visual inspection and reports of past operational performance, the dam is assessed to be in fair condition. Areas of major concern regarding the long-term safety of the dam include deterioration of the concrete dike section and the concrete stop log piers. It is small in size with a significant hazard potential. Keywords include: Inspection, Dam safety, Piscataqua River Basin, Milton, New Hampshire, and Salmon Falls River.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1979
Accession Number
ADA156475

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Construction
  • Dams
  • Drainage Basins
  • Engineering
  • Engineers
  • Masonry
  • Materials
  • Materials Testing
  • Navies (Foreign)
  • New England
  • New Hampshire
  • Photographs
  • Photography
  • Safety
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.