National Program for Inspection of Non-Federal Dams, Bellamy Reservoir Dam (NH 00471), Piscataqua River Basin, Madbury, New Hampshire. Phase I Inspection Report.

Abstract

The dam is a 462 ft. long gravity concrete and earth embankment dam. The dam is judged to be in good condition. It is intermediate in size with a high hazard potential. The test flood is equal to the PMF. Based on the findings of the visual inspection and hydrological and hydraulic analysis, there is no need for further engineering studies or for major alterations to the dam. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1979
Accession Number
ADA156549

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Inspection
  • Materials
  • New England
  • New Hampshire
  • Reservoirs
  • United States
  • Visual Inspection
  • Warning Systems
  • Water Resources
  • Water Supplies

Readers

  • Hydraulic Engineering.