National Program for Inspection of Non-Federal Dams, Bellamy Reservoir Dam (NH 00471), Piscataqua River Basin, Madbury, New Hampshire. Phase I Inspection Report.
Abstract
The dam is a 462 ft. long gravity concrete and earth embankment dam. The dam is judged to be in good condition. It is intermediate in size with a high hazard potential. The test flood is equal to the PMF. Based on the findings of the visual inspection and hydrological and hydraulic analysis, there is no need for further engineering studies or for major alterations to the dam. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1979
- Accession Number
- ADA156549
Entities
Organizations
- New England District, U.S. Army Corps of Engineers