National Program for Inspection of Non-Federal Dams. Pascoag Reservoir Upper Dam (RI 00304), Blackstone River Basin, Burrillville, Rhode Island. Phase I Inspection Report.

Abstract

The dam is an earth embankment structure. It is about 475 ft. long and 27 ft. high. The dam is considered to be in poor condition. To assure the long term performance of the dam, several items require attention. It is intermediate in size with a high hazard potential. Overtopping could result in failure of this dam. There are recommendations and remedial measures that should be implemented by the owner.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1979
Accession Number
ADA156841

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Civil Engineering
  • Construction
  • Dams
  • Drainage Basins
  • Engineering
  • Engineers
  • Flood Control
  • Floods
  • Materials
  • Natural Resources
  • New England
  • Plastic Explosives
  • Rhode Island
  • Safety
  • Standby Equipment
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.