National Program for Inspection of Non-Federal Dams. Jacksonville Pond Dam (VT 00148) Connecticut River Basin, Whitingham, Vermont. Phase I Inspection Report.

Abstract

The dam is a concrete and stone masonry structure. The dam is judged to be in fair condition. There is no means available for drawing down the pool level if an emergency situation were to occur. It is small in size with a high hazard potential. The test flood is equal to the full PMF. There are various remedial measures which should be undertaken by the owner. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1981
Accession Number
ADA157233

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Connecticut
  • Connecticut River
  • Construction
  • Dams
  • Drainage Basins
  • Engineering
  • Engineers
  • Environmental Protection
  • Flood Control
  • Masonry
  • Natural Resources
  • New England
  • Safety
  • United States
  • Visual Inspection
  • Warning Systems
  • Water Resources

Readers

  • Hydrologic Risk Analysis and Mitigation.