Proceedings of the Meeting of the Coastal Engineering Research Board (43rd) Held at Vicksburg, Mississippi on 22-24 May 1985.
Abstract
Partial Contents; Crescent City Dolos Project; San Pedro Breakwater Repair Study; Wave Stability Tests of Proposed Dolos and Armor Stone Rehabilitation Design Alternatives for the East Breakwater at Cleveland Harbor, Ohio; Model Studies of Lake Pontchartrain Outfall Canal; Model Studies of Mission Bay Harbor, San Diego County, California; Model Study of Los Angeles and Logn Beach Harbors, California; Low-Crested Breakwater Studies in 11-ft-wide Spectral Wave Tank; Breakwater Stability Studies in CERC's 6-Ft Spectral Wave Flume; Physical and NUmerical Model Investigations of Fisherman's Wharf Area, San Francisco Bay, California; Automated Data Acquisition and Control System; Model Studies of Noyo River and Harbor, California; Portable Directional Spectral Wave Generator; Wave Runup and Overtopping Test of Roughan's Point Seawall in 3-ft Spectral Wave Flume; Movable Bed Modeling Research being Conducted in 1.5-ft-wide Spectral Wave Flume; Wave Estimation for Design; Nearshore Waves and Currents; Barrier Island Sedimentation Studies; Evaluation of Navigation and Shore Protection Structures.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1985
- Accession Number
- ADA159991
Entities
People
- R. W. Whalin
Organizations
- Coastal Engineering Research Center