Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1 for Tinker AFB, Oklahoma. Volume 1.
Abstract
The purpose of the Phase III (Stage 1) investigation was to determine if environmental contamination has resulted from waste disposal practices at Tinker AFB. In addition, the investigation included an estimate of the magnitude and extent of contamination, the identification of environmental consequences of migrating pollutants, and the recommendation of additional investigations necessary to identify the magnitude, extent and direction of movement of discovered contaminants. The field work consisted of the installation and sampling of eleven gound-water monitoring wells, electromagnetic surveys of two waste disposal sites, followed by coring and sampling of shallow soils at these sites, sampling and analysis of ground water from Tinker AFB water supply wells, and the investigation of trichloroethylene contamination in two Tinker AFB water supply wells.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1985
- Accession Number
- ADA160093
Entities
People
- D. A. Sanders
- R. W. Bauer