Deployment Test Report, JLOTS (Joint Logistics Over-The-Shore) II

Abstract

When the military operations are conducted in areas where port facilities for containerships are not available for either military or geographic reasons, then the supplies and equipment must be brought ashore in Logistics Over-the-Shore (LOTS) operations. The Joint Logistics Over-the-Shore (JLOTS) II joint test and evaluation project is intended to assess the Services' current capability to conduct Assault Follow-On Echelon (AFOE) and LOTS operations. This is the latest in a series of joint tests begun in 1970 to aid in the development of a container handling capability in AFOE/LOTS operations. JLOTS II is separated into three test phases. Phase I, the Deployment Test, is to assess the capabilities to deploy the logistics delivery equipment in merchant ships to an operating area. Phase II, the Roll-On/Roll-Off (RO/RO) test, is to assess the capability to assemble, install, and operate an offshore RO/RO Discharge Facility and to deliver vehicular cargo ashore from merchant RO/ RO vessels. Phase II, the Throughput Test, is to assess the Services' capability to install and use their delivery systems for container, breakbulk, and bulk liquid cargo and to define the operating performance of the combined systems in a joint test. This report covers the Phase I, Deployment Test.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1985
Accession Number
ADA160515

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Automatic Frequency Control
  • Boats
  • Civil Engineering
  • Computer Programs
  • Construction
  • Engineers
  • Environment
  • Logistics
  • Marine Transportation
  • Military Equipment
  • Military Science
  • Navy
  • Test And Evaluation
  • Test Equipment
  • War Colleges

Readers

  • Aerospace Test and Evaluation
  • Maritime Combat Support and Expeditionary Logistics.
  • Naval Architecture and Marine Engineering.