Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9.
Abstract
Contents: Introduction; Foundation Investigations; Geology; Unwatering; Foundation Excavation; Foundation Treatment; Rock Bolts and Stilling Basin Anchors; Post Tensioning; Structural Concrete.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1984
- Accession Number
- ADA160524
Entities
Organizations
- St. Louis District, U.S. Army Corps of Engineers