Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9.

Abstract

Contents: Introduction; Foundation Investigations; Geology; Unwatering; Foundation Excavation; Foundation Treatment; Rock Bolts and Stilling Basin Anchors; Post Tensioning; Structural Concrete.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1984
Accession Number
ADA160524

Entities

Organizations

  • St. Louis District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Air Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Birds
  • Construction
  • Explosives
  • Flood Control
  • Groundwater
  • Joints
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Materials Testing
  • Measurement
  • Modulus Of Elasticity
  • Performance Tests
  • Plastic Explosives
  • Reinforced Concrete
  • Riprap
  • Test And Evaluation

Readers

  • Electrical Engineering
  • Hydraulic Engineering.
  • Technical Research and Report Writing.