Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 2. Narrative, sections 10 thru 13.

Abstract

Contents: Embankment: Material Sources, Utilization of Materials, Embankment Placement, Changes in Embankment Sequence Due to the July 1981 Flood, Compaction and Moisture Control, Construction Testing - Quality Assurance, Contractor Quality Control Testing; Instrumentation: Concrete Structure, Downstream Walls, Right Abutment, Embankment (Prior to Diversion 24 July 1979), Embankment Instrumentation (After Diverion 24 July 1979), Left Abutment, Observation Schedule; Drilling and Grouting.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1984
Accession Number
ADA160525

Entities

Organizations

  • St. Louis District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Command Control Communications
  • Construction
  • Electrical Resistance
  • Embankments
  • Engineers
  • Groundwater
  • Insensitive Explosives
  • Materials
  • Materials Laboratories
  • Materials Science
  • Materials Testing
  • Measurement
  • Molecular Orbital Theory
  • Piezometers
  • Plastic Explosives
  • Riprap
  • Self Assembly

Readers

  • Geotechnical Engineering.
  • Hydraulic Engineering.
  • Technical Research and Report Writing.