Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 3. Photographs, pages 1 thru 59.

Abstract

Contents: Right Abutment; Concrete Structure; Diversion Channel; Left Abutment; Foundation Instrumentation; Drilling and Grouting.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1984
Accession Number
ADA160526

Entities

Organizations

  • St. Louis District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • Concrete
  • Construction
  • Contracts
  • Dams
  • Drilling
  • Elevation
  • Embankments
  • Engineers
  • Excavation
  • Grouting
  • Instrumentation
  • Missouri
  • Photographs
  • Shotcrete
  • Stilling Basins

Readers

  • Geotechnical Engineering.
  • Hydraulic Engineering.
  • Technical Research and Report Writing.