Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 3. Photographs, pages 137 thru 209.

Abstract

Contents: Diversion Channel.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1984
Accession Number
ADA160528

Entities

Organizations

  • St. Louis District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Backfills
  • Biological Staining And Labeling
  • Compressed Air
  • Concrete
  • Construction
  • Construction Materials
  • Contracts
  • Elevation
  • Embankments
  • Excavation
  • Grouting
  • High Angles
  • Materials
  • Photographs
  • Production

Readers

  • Business Analytics
  • Hydraulic Engineering.