Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 3. Photographs, pages 292 thru 383.

Abstract

Contents: Left Abutment: Basal Concrete Fillets; Cutoff Wall; Downstream Ravine; Embankment Contact Area; Cutoff Trench.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1984
Accession Number
ADA160530

Entities

Organizations

  • St. Louis District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Air
  • Backfills
  • Compressed Air
  • Concrete
  • Construction
  • Construction Materials
  • Contamination
  • Contracts
  • Elevation
  • Embankments
  • Engineers
  • Photographs
  • Photography
  • Template Patterns

Readers

  • Business Analytics
  • Hydraulic Engineering.