Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 3. Photographs, pages 384 thru 409.

Abstract

Contents: Foundation Instrumentation; Drilling and Grouting.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1984
Accession Number
ADA160531

Entities

Organizations

  • St. Louis District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Construction
  • Contracts
  • Drilling
  • Drills
  • Electrical Resistance
  • Elevation
  • Embankments
  • Excavation
  • Grout
  • Grouting
  • Instrumentation
  • Lead Wires
  • Materials
  • Piezometers
  • Pipe Wrenches
  • Stilling Basins
  • Trenches

Readers

  • Business Analytics
  • Geotechnical Engineering.
  • Hydraulic Engineering.