Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 4. Drawings, drawing 66-2 thru 130-2.

Abstract

This volume contains engineering drawings of concrete monoliths, foundation areas, walls, drains, joints, and instrumentation placement.

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1984
Accession Number
ADA160533

Entities

Organizations

  • St. Louis District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Civil Engineering
  • Concrete
  • Construction
  • Construction Materials
  • Contracts
  • Embankments
  • Engineering
  • Engineering Drawings
  • Flood Control
  • Instrumentation

Readers

  • Hydraulic Engineering.
  • Software Engineering