Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 4. Drawings, drawing 131-2 thru 195-2.
Abstract
This volume contains engineering drawings of abutment and cutoff wall concrete fillets, cutoff walls, grout curtains, foundation drains, boring log profiles, and aerial photographs.