Reevaluation of the Oliver Lock Replacement Project. Appendix B. Economics.
Abstract
This appendix contains detailed data and analyses of the transportation economics analyses pertaining to a reevaluation of the Oliver Lock Replacement Project. The following sections and attachments document the evaluation procedures and provide estimates of the National Economic Development (NED) benefits which are expected to result from the proposed project. The primary aim of this study was to estimate the navigation benefits which would reasonably accrue to the Oliver Lock Replacement over a 50-year project life (1990-2039). Cost and benefit data contained herein relfect October 1982 price levels. Average annual benefits were computed using a 7-7/8 percent interest rate.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1985
- Accession Number
- ADA163256
Entities
People
- Glenda Smith
- Larry L. Daggett