FASCOM Soldering Process Control Evaluation.

Abstract

Based upon observations of the manufacturing processes at Honeywell, Inc., New Brighton, MN and Aerojet Corp., Downey, CA, the writer feels that certain major activities must be performed to ensure minimum risk and maximum reliability of the finished product. The recommendations contained in this report will promote similarity in FASCAM products. ADAM and RAAM are both delivered to target in basically the same manner; both are expected to face the same stress conditions in storage and in use. Therefore, there should be a single, unified standard of workmanship for FASCAM products.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1982
Accession Number
ADA164194

Entities

People

  • Fred Fitzsimmons

Organizations

  • Battelle Memorial Institute

Tags

DTIC Thesaurus Topics

  • Acceptability
  • Circuit Boards
  • Contractors
  • Contracts
  • Engineering
  • Engineers
  • High Reliability
  • Manufacturing
  • Manufacturing Engineering
  • Printed Circuits
  • Production
  • Reliability
  • Specifications
  • Standards
  • Test And Evaluation
  • Test Methods
  • Training

Readers

  • Environmental Remediation and Restoration.
  • Industrial Economics
  • Military Science