West Coast Ocean Construction Platform Preliminary Design Study. Volume 2. Appendices.
Abstract
The study was divided into two parts: (1) Develop preliminary design configurations and conversion cost estimates on two platforms capable of performing the ocean construction work; (2) Supply performance schedules and operational costs for three specific methods for performing the ocean construction work. Contents: Scenarios and Design Criteria; Installed Equipment Requirements; Envelope Size and Design Criteria Summary; Comments on Candidate Hulls; Conversion Modifications and Class F Estimates; Small Drillship/Barge Availability Summary; Preliminary Profiles and Class D Estimates; Drawing Schedule and Arrangement Drawings for Conversion of YFNB and Drillship; Ex-Drillship Light Ship Estimate and Trim and Stability Summaries; Ex-Drillship Dynamic Motion and RAO Curves and Bretchneider's Sea Spectrum Data; WCOCP Positioning Power; YFNB Electrical Preliminary Design Data; System Isometric Drawings for YFNB; YFNB Light Ship Estimate & Trim and Stability Summaries; YFNB Dynamic Motion and RAO Curves; YFNB Passive Anti-Roll Tank Calculations; Class C Estimates for the Converted YFNB and Ex-Drillship; ABS Worldwide Technical Services, Inc. Condition Survey on YFNB 41; Cost Summary and Dedicated Hull Costs; Charter (Lease) Option Costs; Contract Option Costs; Amortization Formula; Vendor Information; Telephone Contact and Meeting Reports.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1978
- Accession Number
- ADA165727