Integrated Battlefield Effects Research for the National Training Center. Appendix J. Division/Corps Training Simulation System

Abstract

The purpose of this document is to provide assistance in establishing the best technical approach for development of a Army training simulation for use by division and/or corps command groups. To accomplish this purpose the developmental approach has been considered from both short term and long term aspects. Short term is defined as what can be done to meet most of the requirements with a fielded system in a 24 month time frame. Long term is defined as the optimum system to fill the division/corps training simulation requirement given a 4-6 year development effort. Models reviewed and compared include: Army Training Battle Simulation System (ARTBASS); Command, Control, Communications, and Combat Effectiveness (FOURCE) Model; JANUS Model; MTM (mcClintic Theater Model); Simulation of Tactical Alternative Responses (STAR); TACSIM; and VECTOR-3 Model.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1984
Accession Number
ADA166030

Entities

People

  • B. Packard
  • D. Erickson
  • J. Birney
  • J. Ickler
  • L. Metzger
  • P. Mckeown
  • R. Plock

Organizations

  • Leidos

Tags

Communities of Interest

  • Biomedical
  • C4I
  • Human Systems
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Artillery
  • Battles
  • Combat Areas
  • Combat Operations
  • Combat Readiness
  • Computers
  • Contingency Operations (Military)
  • Mathematical Models
  • Military Organizations
  • Military Science
  • Organizational Structure
  • Personnel Management
  • Students
  • Test And Evaluation
  • Training
  • War Colleges
  • Warfare

Readers

  • Business Analytics
  • Military Training and Readiness Simulation
  • Regression Analysis.

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control