Dynamic Production Scheduling in Computer-Aided Fabrication of Integrated Circuits,
Abstract
The scheduling of a VLSI manufacturing facility is being studied using QMIT's new Integrated Circuits Laboratory (ICL) as a testbed. This paper describes the facility, outlines the scheduling methodology that is under investigation and presents the design of the initial preliminary scheduling system. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1986
- Accession Number
- ADA166512
Entities
People
- Christopher Lozinski
- Stanley B. Gershwin
Organizations
- Massachusetts Institute of Technology