Simplex Mooring Underwater Inspection Report.

Abstract

This inspection report contains an evaluation of the Navy-owned mooring located at the Simplex Wire and Cable Company plant near Portsmouth, NH. This information is based on an underwater inspection of the mooring by CHESNAVFACENGCOM and divers from Underwater Construction Team One during the period 4-8 April 1983. In addition to the inspection, a marker buoy used to retrieve the shore leg portion of the mooring was replaced. The inspection revealed no major discrepancies in the mooring or significant changes from the results of the previous inspection. Keywords: Mooring systems, Simplex mooring, and Underwater inspection.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1983
Accession Number
ADA167239

Entities

Organizations

  • Naval Facilities Engineering Systems Command

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Abstracts
  • Assembly
  • Availability
  • Buoys
  • Classification
  • Coast Guard
  • Construction
  • Decompression Chambers
  • Diameters
  • Engineers
  • Inspection
  • Measurement
  • Mooring Buoys
  • Security
  • Test And Evaluation
  • Underwater Construction

Fields of Study

  • Engineering

Readers

  • Facility/Structural Engineering.