Public Works Center Pearl Harbor Fleet Moorings Underwater Inspection Report.

Abstract

During the period 3 through 13 May 1983, a CHESNAVFACENGCOM Engineer-in-Charge and divers from Underwater Construction Team Two (UCT TWO) conducted an inspection of the 42 fleet moorings operated and maintained by PWC Pearl Harbor. Eighteen of the moorings were found to be in good condition, three should not be used due to major discrepancies, and twenty-one were found to be in satisfactory condition for continued use within the constraints of their load capacities. Keywords: Mooring inspection, Underwater inspection, Fleet moorings.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1983
Accession Number
ADA167247

Entities

Organizations

  • Naval Facilities Engineering Systems Command

Tags

DTIC Thesaurus Topics

  • Cathodic Protection
  • Classification
  • Concrete
  • Construction
  • Displacement
  • Engineering
  • Engineers
  • Hurricanes
  • Inspection
  • Maintenance
  • Materials
  • Metal Plates
  • Plastic Explosives
  • Second World War
  • Security
  • Ship Maintenance
  • Underwater Construction

Readers

  • Hydrologic Risk Analysis and Mitigation.
  • Maritime and Naval Warfare Studies
  • Systems Analysis and Design