Subic Bay Fleet Moorings Underwater Inspection: Project Execution Plan.

Abstract

The purpose of this plan is to accurately define the responsibilities of the task team and to provide a comprehensive plan of action for the inspection of 18 riser type and two telephone type fleet moorings currently operated and maintained by PWC Subic Bay. Underwater Construction Team Two (UCT-2) will provide underwater inspection personnel and CHESNAVFACENGCOM (code FPO-1) will provide a Project Engineer for technical support. Current reports indicate that PWC Subic maintains 20 Fleet Moorings ranging in size from Class A to Class D with designed holding powers from 150 to 50 Kips respectively.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1982
Accession Number
ADA167304

Entities

Organizations

  • Naval Facilities Engineering Systems Command

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Abstracts
  • Availability
  • Cameras
  • Classification
  • Construction
  • Construction Equipment
  • Engineers
  • Inspection
  • Logistics
  • Maintenance
  • Materials
  • Measurement
  • Photographs
  • Photography
  • Plastic Explosives
  • Security
  • Transportation

Readers

  • Facility/Structural Engineering.
  • Maritime and Naval Warfare Studies