Ocean Construction Platform SEACON Trim and Stability Study.
Abstract
The trim and stability study of the Ocean Construction Platform (Seacon) performed 3-1-75 has been updated and is included in this report. A new GM was arrived at by calculating all additions, removals and changes performed on the ship since the first study. A list of these changes is included in the appendix. Keywords: Barges; and Trim(Hydrodynamics).
Document Details
- Document Type
- Technical Report
- Publication Date
- May 03, 1980
- Accession Number
- ADA167479
Entities
Organizations
- Naval Facilities Engineering Systems Command