Underwater Facilities Inspections and Assessments at U.S. Naval Station, Guantanamo Bay, Cuba.
Abstract
The underwater inspection was conducted between 19 and 28 June 1979 and included the following facilities: Pier V, Pier L, Pier Q, Pier C, Mooring BB-1, Pier A, Wharf B, Wharf T, and various sections of quaywall between the piers. A representative number of piles or sections of wharves and quaywalls were inspected in detail, including scraping off growth and productions of corrosion, measuring material thicknesses, and taking underwater photographs. All significant evidence of underwater deterioration was recorded and the condition of the surface and abovewater structure was noted.