Underwater Facilities Inspections and Assessments at U.S. Naval Station, Guantanamo Bay, Cuba.

Abstract

The underwater inspection was conducted between 19 and 28 June 1979 and included the following facilities: Pier V, Pier L, Pier Q, Pier C, Mooring BB-1, Pier A, Wharf B, Wharf T, and various sections of quaywall between the piers. A representative number of piles or sections of wharves and quaywalls were inspected in detail, including scraping off growth and productions of corrosion, measuring material thicknesses, and taking underwater photographs. All significant evidence of underwater deterioration was recorded and the condition of the surface and abovewater structure was noted.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1980
Accession Number
ADA167496

Entities

Organizations

  • Naval Facilities Engineering Systems Command

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Availability
  • Classification
  • Concrete
  • Construction
  • Construction Materials
  • Corrosion
  • Degradation
  • Engineering
  • Maintenance
  • Materials
  • Naval Shore Facilities
  • Photographs
  • Reinforced Concrete
  • Security
  • Underwater Construction
  • Waterfront Structures

Readers

  • Facility/Structural Engineering.