San Diego Fleet Moorings Underwater Inspection Plan.

Abstract

The purpose of this plan is to accurately define the responsibilities of the task team and provide a comprehensive plan of action for the inspection of 23 fleet moorings consisting of 33 buoy systems currently operated and maintained by PWC San Diego. Underwater Construction Team Two (UCT-2) will provide underwater inspection personnel and CHESNAVFACENGCOM (code FPO-1) will provide an engineer for technical support. Nine of the moorings, located in relatively shallow water near the deperming pier, are seldom used and consist of one to three legs attached to stockpiles and/or stockless anchors. The remaining moorings are located near the Naval Station, NAS North Island, and near Harbor Island. All of the moorings are either riser-or telephone-type moorings except for the two special and 3 Mediterranean moorings.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1982
Accession Number
ADA167543

Entities

Organizations

  • Naval Facilities Engineering Systems Command

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Buoys
  • Cameras
  • Cathodic Protection
  • Classification
  • Construction
  • Construction Equipment
  • Engineering
  • Engineers
  • Inspection
  • Maintenance
  • Materials
  • Measurement
  • Mooring Buoys
  • Naval Shore Facilities
  • Photographs
  • Photography
  • Underwater Construction

Readers

  • Facility/Structural Engineering.
  • Logistics and Supply Chain Management.
  • Maritime and Naval Warfare Studies