Improved Procedure for Loading the M198 Towed Howitzer Aboard a C130 Cargo Plane.
Abstract
The original procedure for on and off loading the M198 howitzer aboard a C130 cargo plane was determined to be time consuming and logistically unacceptable. This report details the reconfiguration of the howitzer from wide to narrow tires and the development of an improved jacking system and front bumper pintle assembly to improve air transportability. Keywords: Low Altitude Parachute Extraction System (LAPES) rails.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1986
- Accession Number
- ADA167623
Entities
People
- Albert G. Ebner
Organizations
- United States Army Armament Research, Development and Engineering Center