Long-Term Effects of Dredging Operations Program. The Duwamish Waterway Capping Demonstration Project: Engineering Analysis and Results of Physical Monitoring.

Abstract

This paper summarizes the initial fieldwork and presents results through the first (6-month) monitoring effort for the subaqueous disposal and capping of contaminated dredged material on the Duwamish Waterway, Seattle, Washington. Keywords: Capping; Contaminated sediments; Dredging--disposal techniques; Duwamish waterway; Open-water disposal.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1986
Accession Number
ADA168169

Entities

People

  • Clifford L. Truitt

Tags

Communities of Interest

  • Energy and Power Technologies
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Acoustic Signals
  • Chemical Analysis
  • Chemical Synthesis
  • Chemistry
  • Civil Engineering
  • Coastal Engineering
  • Engineering
  • Engineers
  • Environment
  • Error Analysis
  • Grain Size
  • Materials
  • Measurement
  • Side Looking Sonar
  • Sonar
  • Water Resources
  • Waterways

Fields of Study

  • Engineering

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering