Pol Pier Repairs, Lajes Field, Azores. Construction Inspection Visit Number 3, September 25-October 3, 1980,
Abstract
Contents: Personnel; General Work Progress; General Work Remaining; Future Ship Berthings; General Time Schedule; Time Delays by Government; Future Work Sequence; Working Hours; Contractor's Work Force; Labor Contract and Wages; Weather Delays; Present Materials and Equipment; Steel Barge; Return of Equipment to U. S. A.; Rock Anchorages; Batter Pile Tie Down at Loading Platform; Epoxy Pressure Grout Repairs of Loading Platform; Harbor Bottom Elevations; New North Dolphin; New South Dolphin; Crushed Quarry Stone Fill; Sheet Pile Fendering for Loading Platform; Sea Cushion Fenders; Approach Roadway Concrete Spalling; Underwater Conditions of New Construction; Concrete Sand; General Facia Spall Repairs; Finders at Dolphin No. 4; Electrical Work; Cathodic Protection; Cleanup; DANAC Storage Shed; Contractor's Claims; Concrete Block Wharf Corner; Navy Resident Officer; Summary Meeting; and Future Inspection Visits.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1980
- Accession Number
- ADA168651
Entities
People
- Jacqueline B. Riley