Pol Pier Repairs, Lajes Field, Azores. Construction Inspection Visit Number 3, September 25-October 3, 1980,

Abstract

Contents: Personnel; General Work Progress; General Work Remaining; Future Ship Berthings; General Time Schedule; Time Delays by Government; Future Work Sequence; Working Hours; Contractor's Work Force; Labor Contract and Wages; Weather Delays; Present Materials and Equipment; Steel Barge; Return of Equipment to U. S. A.; Rock Anchorages; Batter Pile Tie Down at Loading Platform; Epoxy Pressure Grout Repairs of Loading Platform; Harbor Bottom Elevations; New North Dolphin; New South Dolphin; Crushed Quarry Stone Fill; Sheet Pile Fendering for Loading Platform; Sea Cushion Fenders; Approach Roadway Concrete Spalling; Underwater Conditions of New Construction; Concrete Sand; General Facia Spall Repairs; Finders at Dolphin No. 4; Electrical Work; Cathodic Protection; Cleanup; DANAC Storage Shed; Contractor's Claims; Concrete Block Wharf Corner; Navy Resident Officer; Summary Meeting; and Future Inspection Visits.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1980
Accession Number
ADA168651

Entities

People

  • Jacqueline B. Riley

Tags

Communities of Interest

  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Cathodic Protection
  • Civil Engineering
  • Classification
  • Concrete
  • Construction
  • Construction Equipment
  • Contractors
  • Contracts
  • Elevation
  • Employment
  • Engineering
  • Engineers
  • Materials
  • New Jersey
  • Platforms
  • Security
  • Sequences

Readers

  • Facility/Structural Engineering.