Cattaraugus Creek, New York. Main Report.
Abstract
The primary water resources need for which a solution is sought in this study, is to reduce flood damages within the Cattaraugus Creek basin. In addition, for the dam/reservoir plans that were developed, the addition of hydroelectric power generating facilities and recreation facilities were also considered to maximize the economic efficiency of the basic flood control plans. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1986
- Accession Number
- ADA169101
Entities
Organizations
- Buffalo District, U.S. Army Corps of Engineers