Testing and Progress of Modulator.
Abstract
The assembly of the modulator itself was nearly completed during February. The installation of the input filter capacitor and the filament stepdown transformer on the modulator output were delayed until March due to late delivery of the components which did not impact the overall schedule of the project. The construction of the thyratron cathode/reservoir power supply, was completed in February. These chassis are the only ones which are absolutely needed before modulator testing is initiated. The design of the master controller was completed in February except for the fault detection circuitry. The assembly of the modulator was completed in March.