Demonstration of the Early-on Manpower Requirements Estimation Methodology: M1 Abrams Main Battle Tank

Abstract

The contractor determined, very early in the acquisition process, the manpower demand over the life cycle of the M1 tank. The resulting estimates are analyzed and compared with the Army's current M1 manning requirements. Finally, the estimates, which are developed at the occupational specialty level, are translated into requirements for general categories of aptitude.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 30, 1983
Accession Number
ADA171532

Entities

People

  • Betty L. Bantor
  • Patricia A. Insley
  • Richard J. Boden Jr.
  • William P. Hutzler

Tags

Communities of Interest

  • Ground and Sea Platforms
  • Human Systems
  • Materials and Manufacturing Processes
  • Weapons Technologies

DTIC Thesaurus Topics

  • Business Administration
  • Computer Programs
  • Computers
  • Cost Analysis
  • Data Analysis
  • Enlisted Personnel
  • Fire Control Systems
  • Logistics
  • Maintenance
  • Maintenance Personnel
  • Management Personnel
  • Military Personnel
  • Organizational Structure
  • Personnel Management
  • Task Forces
  • Test And Evaluation
  • Turbines

Readers

  • Life Cycle Cost Analysis
  • Military Science
  • Psychometric Testing or Psychological Assessment.